Analisis Penjadwalan Perawatan Recloser dan PMCB di PT PLN (Persero) UP3 Malang
Analysis of Scheduling Maintenance Recloser and PMCB in PT PLN (Persero) UP3 Malang
ARSHA MANUNGGALA YODHANTA, DIMAS SENOAJI BINTANG PURNOMO
Arsha Manunggala Yodhanta dan Dimas Senoaji Bintang Purnomo 2019. Analysis Scheduling Maintenance Recloser and PMCB in PT PLN (Persero) UP3 Malang. Final report. Electrical Engineering Study Program, Department of Electrical Engineering, State Polytechnic of Malang. Advisor: Ir. Gatot Joelianto, M.MT, M. Fahmi Hakim, ST, MT. Recloser and PMCB become one important componenet in the electriciall protection system. However, PLN still doesn’t pay attention to the assets owned, including reclosers and PMCB. The main purpose of this study is that protective equipmetn especially, Recloser adn PMCB can be maintainaed on a scheduled bais. So that, the lifetime or working period of the equipment is longer Based on the analysis of Reclosers and PMCB component with MTTF (Mean Time to Failure) dan MTBF (Mean Time Between Failures) methods, recomendation fo scheduling component maintenance Recloser and PMCB can be determined in UP3 Malang. Based on the analysis using the One Way Anova method and Pareto Diagram analysis support recomendation can be determined in scheduling miantenance. And what actions should be taken to anticipate component damage