Implementasi Charger Controller, Inverter dan Baterai Pada Pembangkit Listrik Pico Hydro di Sumber Jeruk Kabupaten Malang

Implemantation of Charger Controller, Inverter and Bateray at Pico Hydro Power Plants in Sumber Jeruk Malang Regancy

MUHAMMAD KHAFI RIDHWAN ZUHDI, SYARIFUL ULUM

The level of electrical energy consumption in the country increased in line with economic growth in Indonesia. However, this condition has not been matched by the availability of electricity generation infrastructure so often there was a deficit of electricity in various regions in Indonesia that can disturb economic activity and industry. Utilization Pico Hydro Power plant (PLTPH) for remote areas not covered by the grid. PLTPH prototype design began with the testing of the Gorlov turbine as the driving generator with the variation of the slope angle of the turbine and the water discharge that varies too. Then, of the test carried out simulation using a changing DC motor rotation by calculation and simulation Pico Hydro power plant is capable of producing a voltage of 23V.

Kata kunci

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.17.5 · 54e4f54