Evaluation Of Drainage System in Sukun Village RW7 to Mitigate inundation Risk Using Epa-Swwm 5.1

Alek Roda Michael Diing

Sukun District frequently experiences flooding during the rainy season, particularly when rainfall exceeds two hours, due to blockages in drainage channels, population growth and a limited number of inlets. This study aims to evaluation flood discharge, determine the necessary dimensions for drainage channels and inlets to effectively manage stormwater during rainy seasons, and estimate the cost of redesigning these systems. The required data for this study included daily rainfall data from 2013-2022 obtained from Sukun, Ciliwung, and Dau stations, existing channel dimensions, a topographic map of the study area, and the 2022-unit price of work in Malang city. The data were processed using the Log-Pearson III distribution to determine the flood design for a 10-year return period. The appropriateness of the log results was assessed using the Chi-Square and Smirnov-Kolmogorov alignment tests. The intensity of rain was calculated using the Mononobe formula. The Storm Water Management Model (EPASWMM 5.1) was employed to simulate the volume and quality of surface runoff from each catchment area, as well as the flow rate and depth in each drainage channel. The results of the Log-Pearson III distribution indicated that the maximum recorded rainfall was 93.827 mm/day, which was deemed acceptable based on the Chi-Square and Smirnov-Kolmogorov test results. The simulation revealed that the existing drainage channels have a capacity of 1.648 m3/sec, which is insufficient to handle the design discharge of 1.685 m3/sec. As a result, overflow occurs during peak flow conditions, indicating that four channels (RT4C, RT4F, RT4H and RT4I) cannot effectively convey the anticipated volume of water. However, the simulation also demonstrated that the proposed redesign of the drainage channels, which involves increasing the channel height while keeping the width constant due to space limitations, significantly improves their capacity. The redesigned channels have a capacity of 2.278 m3/sec, exceeding the design discharge of 1.685 m3/sec. This redesign ensures that the channels can accommodate the expected volume of water without experiencing overflow, even during peak flow conditions. The estimated cost of this redesign is IDR 280,450,000.00.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.1 · b64e595