Analysis of Borepile Design Modification for Velodrome-Manggara LRT Project Effectiveness
Abstrak
This research aims to reanalyze the bore pile foundation design for the Jakarta LRT Phase 1B project at point P64B by evaluating soil conditions and structural load combinations. The study uses soil test data (SPT), bearing capacity analysis based on Mayerhof and Vesic methods, and structural modeling with SAP2000, alongside reinforcement detailing with Revit. It includes analysis of single and group pile capacities, group pile efficiency, elastic and consolidation settlements, and pile cap design. The results reveal that the existing bore pile is susceptible to significant settlement. The redesign suggests an optimal pile diameter of 0.6 m and a depth of 23 m, satisfying safety and settlement limits. The total estimated cost for the redesigned foundation and pile cap is approximately IDR 580,115,413.90, indicating better cost-efficiency than the original design. This study is expected to serve as a reference for improving foundation safety and cost-effectiveness in future infrastructure projects.