Drainage System Design on The Light Rail Transit (LRT) Road Rawamangun-Pasar Pramuka Phase 1B STA 0+130 to 3+445

Alfina Rahma Al-Banjary

Light Rapid Transit (LRT) is a modern and efficient public transportation system constructed above ground to reduce traffic congestion and provide high accessibility. One of the critical components of LRT infrastructure is the drainage system, which functions to prevent water ponding on the tracks that could endanger safety and damage the electrical systems. This final project aims to design an effective drainage network for the LRT road segment between Velodrome and Pasar Pramuka (Phase 1B, STA 0+300 to 3+680). The study includes hydrological and hydraulic analysis, covering rainfall intensity calculation, design flood discharge estimation, drainage channel design, and construction method planning. The proposed channel dimensions include U-Ditch types of 0.5 x 0.5 m and 0.8 x 0.8 m, as well as box culverts of 0.6 x 0.6 m and 0.8 × 0.8 m. The planning is based on both technical and nontechnical standards, taking into account social, environmental, and economic aspects. The total estimated budget required for the construction of the drainage system is Rp 10,105,391,426.42. The system is expected to manage stormwater runoff effectively and ensure the safety and operational reliability of the LRT corridor.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.20.5 · 33e0fa7