Study of Flooding in The Pandanwangi Area in Watershed Kalisari Using SWMM 5.1 Application
This study focuses on flooding issues in the Pandanwangi area, particularly at the La Sucipto-Gang Makam intersection in Malang City, which is part of the Kalisari watershed. Due to rapid urban development and economic growth, the percentage of flooding has increased, possibly due to inadequate drainage or drainage systems that are unable to accommodate continuous rainfall. It is necessary to analyze the exact causes of flooding, therefore this study aims to analyze flood flow rates, existing channel capacity, calculate the budget plan for redesign, and determine the influence of the watershed area on the Kalisari River Basin. The analysis methods used are hydrological and hydraulic analysis for calculations using three rainfall stations: Ciliwung, Singosari, and Jabung. Flood flow analysis uses the SWMM 5.1 application, and modeling uses the EPA SWMM application. Calculations for existing channels and redesign must be controlled to ensure that the calculations are accurate. Results After calculating the 10-year design rainfall using the Gumbel method, the result was 106.752 mm/day. Analysis using SWMM 5.1 software and calculations for existing channels and redesign revealed flooding from point S-R to point O-N. The new dimensions capable of accommodating flood discharge are a height of 1.2 m and a width of 0.4 m. The estimated budget for the redesign at that point is approximately Rp. 189.075.905.55. The conclusion is that a redesign is necessary from point S-R to O-N because the capacity of the existing drainage channel is insufficient.