The Application of Value Engineering in The Contruction of Campus III UIN Malang (Case Study : Engineering Lecture Building 02)
In the construction project of campus III of UIN Malang, Engineering Lecture Building 02, efficiency and management related to construction costs. One of them is the business by applying Value Engineering (VE), which is a method by using several stages ranging from the information stage, creative stage, analysis stage and development and recommendation stage. Savings by looking for cheaper alternatives but still maintaining function and quality by considering the advantages and disadvantages of each work alternative will be evaluated Engineering, The method used is Pareto analysis as a determination of work items, profit and loss analysis, zero-one method and life cycle cost analysis as alternative selection in this study examines how much savings occur if the work is Selected in Value Engineering. The results of the study show the application of Value Engineering in the construction project of campus III of UIN Malang Engineering Lecture Building 02 on door and window work, wall work, and wall and floor finishing work. The total initial construction cost of Rp.78,474,577,233 if presented will result in savings of 3.676% of the total original budget. The savings are equivalent to a value of Rp. 945,446,805.74, As a supporting measure, a life cycle cost calculation was carried out for all stages of operation and maintenance, which shows that the implementation of this strategy resulted in savings of Rp.1,165.720.749 or 2,839%.