Evaluation Of Bagong Dam Spillway And Stilling Basin Dimensions Comparing Synthetic Unit Hydrographs
Abstrak
In 2022, Trenggalek experienced a significant flood that submerged several subdistricts. Therefore, mitigation measures are needed by constructing a dam, especially a spillway structure to save the main dam building. The focus of this research is Bagong Dam located in Trenggalek. This study aims to evaluate the spillway and stilling basin dimensions comparing synthetic unit hydrographs methods, especially Nakayasu and Gama I, to determine the optimal method. The evaluation results indicate that the Nakayasu method has a QPMF value of 804.173 m³/second, while the Gama I method has a QPMF value of 497.787 m³/second. Based on the historical floods in Trenggalek, the Nakayasu method is considered more optimal with a QPMF value of 804.173 m³/second. The dimension evaluation of the spillway using the Nakayasu method results in a spillway crest width of 35 meters with U.S.B.R. Ogee Type I, a floodway channel 1 length of 132 meters with a width of 35 meters, a floodway channel 2 length of 134.5 meters with a width of 35 meters, a floodway channel 3 length of 94 meters with a width of 35 meters, and a USBR III type stilling basin with a width of 35 meters and a jump length of 14 meters. The estimated cost totals Rp. 258,896,452,000.00.