Project Planning Proyek Pembangunan Apartemen Cambio Lofts Tangerang Selatan
Project Planning Proyek Pembangunan Apartemen Cambio Lofts Tangerang Selatan
The project of Cambio Lofts Apartment is owned by PT. Graha Indah Semesta which is done by PT. Brantas Abipraya (Persero) with a contract value of IDR 640,000,000 for 1369 calendar days. Project Planning is used so that the construction work process can be on time, cost, and quality. In the preparation of this thesis will discuss the formulation of the problem consisting of Organizational Structure, Site Layout, Strategy and Implementation Method, Scheduling, Quality Plan, Safety Plan, and Implementation Budget Plan. The data needed to make project planning include work plans and requirements, technical drawings, and basic unit prices. In preparing the work schedule using the program Microsoft Project 2019, and project costs using Microsoft Excel 2019. The results of the preparation of Project Planning produce a functional organizational structure, there are 2 project gates and 2 Tower Cranes, by dividing 3 work zones in a duration of 950 calendar days. Conducted material testing in the field to comply with technical specifications and SOP (Standard Operating Procedure). For the prevention of work accidents, workers must use Personal Protective Equipment and install work signs. The Implementation Budget Plan is IDR 575.657.116.744,21.